On-site business
Largest refinery in the Cologne chemical areaFramework contract work:
Maintenance work as well as work preparation, primary and secondary steel construction up to the new construction of pipelines, documentation and periodic inspections of equipment and pipelines. 2021-2026
Systems business
Modernisation of the gas turbine plant at BASF in Schwarzheide
Replacement of an existing GE fr.6B gas turbine and the transmission gearbox with an Alstom generator with a new more powerful and efficient Siemens SGT-800. This will require the replacement of mechanical components (including air intake house and exhaust diffuser) and auxiliary systems (natural gas package, lube oil package, anti-icing). The generator will be overhauled and reinstalled. September 2020 - August 2021
Pipeline construction
MAN Diesel & Turbo SERenewal of piping circuit test bench, OB
Piping of a compressor train consisting of a gas turbine and a compressor for testing on an open-air test bench. 3,750 hours September 2017 - March 2018
Boilers and ancillary equipment
Uniper KW GmbHLignite-fired power plant in Schkopau
Change of superheater heating surface June - July 2020
Apparatus / heat exchangers
Apparatus / tank / heat exchangers
October 2021
On-site business
Largest chemical company in Cologne-WorringenFramework contract work:
Maintenance work, decommissioning and commissioning of tanks and their repair as well as turnaround work for up to 100 employees. 2019-2024
Systems business
VEO, EisenhüttenstadtModernisation of IKW
Detail engineering, delivery, installation and commissioning of water-steam cycle 68,000 hours September 2020 - March 2022
Pipeline construction
RWE Power AG
Niederaussem power plant, unit G
Replacement of high-pressure pipelines, partial replacement of the HZÜ pipeline and renewal of the outlet collectors ZÜ3. Installation time: 35 calendar days, approx. 100 m DN 600, approx. 120 m DN800, approx. 10 m DN1200. 25,000 hours July - August 2018
Kessel
BASF Antwerpen
GuD-Kraftwerk in Antwerpen
Reparatur Dampfkessel. Juli - August 2020
Apparatus / heat exchangers
Apparatus/tank/heat exchangers
February 2022
Automation
Allessa Chemie and Heraeus, Rhine-Main area
Work framework contract, engineering, EMSR assembly, maintenance 1975 - 2019
Valve technology
Emschergenossenschaft, Bottrop
Valve maintenance (control, manual and safety valves) ongoing
On-site business
Oiltanking Amsterdam BV, Tank Farm Amsterdam
Directed works/ framework contract for the service of Maintenance, Repair and Operations Dismantling and cleaning of VRU filters Asbestos removal from flange gaskets (BatterySpray®) On-call service 24/7 15,000 hours per year January 2018 - today
Systems business
HKW Mitte Braunschweig
New Balance of Plant (BoP), Functional/process engineering planning, Planning, statics, delivery and assembly of the connecting pipe bridges Detail engineering, supply and installation of water-steam cycle 65,700 hours July 2020 - April 2022
Dampers
USG Utility Support GroupChemelot Chemical Park, Geleen
Supply of Morlock butterfly dampers type L-D Material S235JR Dimension lw. 3000 x 3000 2019
On-site business
USG Utility Support Group, GeleenRecommissioning F3600 Dismantling of burners, fans, steel construction, level measurements Detail engineering, supply and installation of burner bends, fans, pumps, blowers, fresh air ducts, piping, steelwork, analysis cabinet, fittings, EMSR technology 5,0000 hours March 2018 until March 2020
Dampers
Schicks GmbH, Greifswald
Tandem damper type LT-LL Material 16Mo3 Dimension lw. 4220 x 2220 2012
On-site business
Sonae Arauco, Beeskow plant
Span dryer 27 m long, approx. 6 m diameter, thirds and 2 chambers complete replacement of the heating pipes 2017
Luvo/Gavo
Heat Hamburg
Tiefstack combined heat and power plant
Revision and refurbishment work on Luvo/Gavo 3,800 hours August - September 2020
On-site business
AcelorMittal, Eisenhüttenstadt steelworks
Annual disassembly and reassembly of the complete casting bend within 48 hours. The stressed casting elbow is extended, renewed and retracted. 2015 - 2023
Luvo/Gavo
BASF Ludwigshafen
Revision work Luvo 300 h September - October 2020
On-site business
Hüttenwerke Krupp Mannesmann GmbH
Blast furnaces A and B, burdening, sintering plant and steelworks, Duisburg
Framework contract works: Steel construction and maintenance of mechanical engineering equipment. Annual 96 h shutdown: all repairs within 24 hours; in addition, increase the core team from 4 to up to 30 employees. 2017 to date
Grates
EnBW Energie Baden-Württemberg AG
MHKW Stuttgart-Münster, Boiler 26
Steam generator with roller grate firing system Carrying out overhaul work on ram feed, feed grate and slag discharge 2017 until 2020
On-site business
ThyssenKrupp, Duisburg plant
Renew circulation water pipe, section. Air-conditioning system, renew DN 125 pipe, section. KW-Ha. Block 4, renew fire extinguishing pipe. 2020
Grates
Zanders GmbH, plant Bergisch-Gladbach
Steam generator with travelling grate firing, boiler 5
Delivery of spare parts, performance of revision work on the travelling grate, replacement of defective shift height regulator, refurbishment of steel substructure 2015 - 2017
Systems business
New construction of district heating pump station Düsseldorf
Planning, delivery and installation of the pump, fittings and piping DN 500 incl. insulation work and EMSR (cabling; control cabinets) 3,000 hours July 2019 - Sept 2021
Our service in brief
Here you will find a small selection of our numerous references for download.
Please just click on the respective icon to open the PDF data.